built-up beam

英 [bɪlt ʌp biːm] 美 [bɪlt ʌp biːm]

组合梁

机械



双语例句

  1. It has been given to general stiffness matrix and general mass matrix of the built-up construction of the board and beam by analyzing unit stiffness matrix of the board and beam in this article.
    通过板及梁的单元刚度矩阵分析,得出板梁组合结构的总刚度矩阵和总质量矩阵。
  2. It is the reasons of cracking in the ends of built-up crane beam, which the tension, compression, and share, as well as the eccentric moment are all acting on.
    钢&混凝土组合式吊车梁支承端处于压、拉、剪复合应力状态,同时,由于施工误差,使支承端存在约束弯矩,是造成端部混凝土开裂的主要原因。
  3. And a simple explanation has been given to a self-programming of calculating the natural frequency of the built-up construction of the board and beam.
    并对计算板梁组合结构固有频率的自编计算机程序作了简要说明。
  4. Analysis about the cracking in the ends of built-up crane beam with steel and concrete
    钢&混凝土组合桁架式吊车梁端部开裂事故分析
  5. Deflection, the total tendency is under the similar load, along with the web plate high increase, the built-up beam rigidity is increasing, amount of deflection unceasing reducing.
    对于挠度来说,总的趋势是在同样的荷载下,随着腹板高度的增加,组合梁的刚度在增加,挠度不断的降低。
  6. The types of foundation pit support consist of steel sheet pile, supports of bored row of piles, soil-nailing wall and built-up members of overhanging beam, anchorage bar and internal bearing of overhanging beam by reinforced concrete.
    基坑支护类型有钢板桩支护、悬臂式、锚杆锚拉式、钢筋砼内支撑梁式钻孔灌注桩排桩支护、土钉墙支护、组合结构支护等。
  7. The Dongping Bridge is a new arcuated built-up system bridges. Half through steel box tied arch and prestressed concrete continuous beam were connected directly, and then the bridge becomes the Cooperation System Bridge with vice-arch.
    东平大桥是一种新型的拱梁组合桥,由中承式钢箱系杆拱与预应力混凝土连续梁直接连接形成协作体系,并保留施工过程中的拉杆形成副拱。
  8. Optimization Calculation of the Natural Frequency of the Built-up Construction of the Board and Beam
    板梁组合结构固有频率优化计算
  9. Based on the built-up beam theory foundation, supplies the new coal lane anchor rod, the joint anchor cable support computation model, and concrete calculate formulas of the flat topping tunnel and arch-type tunnel respectively.
    在组合梁理论的基础上提出了新的煤巷锚杆、锚索联合支护计算模型,分别给出了平顶巷道和拱型巷道的具体计算公式。
  10. Optimization of Pipe Laying Mode in Built-up Beam Construction System
    组合梁结构体系中管道铺设方式优选
  11. At present, domestic and foreign basically is to the straight line built-up beam negtive moment area research. It has made the very big progress, but actually relatively falls behind regarding the curve steel-concretes 'research.
    目前,国内外基本上处于对直线组合梁负弯矩区的研究,取得了很大的成果,而对于曲线钢&混凝土的研究却相对落后。